To Do List 5/28/14
Task |
Priority |
Description |
Date Completed |
Have fun. Play with kids. | High | ||
Clean garage gutters. There are weeds growing in them | High | ||
High | Spring 2014 | ||
Replace Grandma’s Light Switch | High | ||
Replace Lauren’s Light Switch | High | ||
Fix the Subaru door lights | High | ||
High | Spring 2014 | ||
Anchor Lauren’s shelf | High | ||
Spread mulch | High | Almost done | 5/27/14 |
High | Should still replace the rope | Spring 2014 | |
Clean out the detached garage (move/sell furniture) and get the truck back in there. | High | Stuff in the garage is getting moldy | |
Install matching black microwave | High | ||
Install matching black dishwasher | High | ||
Level the stove | High | ||
Sell old TV | High | ||
Sell old dishwasher | High | ||
Sell old oven | High | ||
Sell old microwave | High | ||
High | May 2014 | ||
Sell old leaf blower | High | ||
Sell baby stuff | High | Ongoing | |
Till/seed the dirt pile from the swing set | High | ||
Refinish the new (to us) kitchen table | High | ||
Eradicate poison ivy | Med | ||
Finish air compressor plumbing | Med | Replaced drain valve 5/24/14 | |
Take down white pines | Med | @ Grandmas | |
Spread wood chips | Med | ||
Seed around the Japanese Maple | Med | ||
Add rails to trailer | Med | ||
Test well water | Med | ||
Clean detached garage ground drain | Med | ||
Paint stairs | Med | ||
Med | May 2014 | ||
Put down the new carpet (and padding) in our bedroom | Med | we’ve had rolled up for months | |
Finish bouldering cave | Med | ||
Fix front door handle | Med | ||
Make basement drain trap splash guard | Med | ||
Seal house deck | Med | ||
Finish swing set drains | Med | ||
Reset Lauren’s closet shelves | Med | Sort of. At least removed the problem shelf | May 2014 |
Install center garage light | Low | ||
Get the motorcycle inspected | Low | ||
Outdoor bouldering wall | Low | ||
Fix the Prius bumper | Low | ||
Reroute well line inside the house | Low | ||
Install/tile new shower | Low | ||
Alter washing machine water lines for new shower | Low | ||
Finish downstairs hideout | Low | ||
Add bathroom shelves | Low | ||
Caulk bathroom vanities | Low | ||
Fix pool shed | Low | ||
Fix pool electric | Low | ||
Fix bathroom drywall and paint | Low | ||
Repair pool deck boards | Low | ||
Fix sandbox cover | Low | ||
15 minute fix. Cost < $5 | |||
Fall 2013 | |||
Med | Fall 2013 | ||
High | Winter 2013 | ||
Fall 2013 | |||
High | Fall 2013 | ||
Summer 2013 | |||
Med | Fall 2013 | ||
Low | Winter 2013 | ||
Low | Fall 2013 | ||
High | Fall 2013 | ||
Low | Fall 2013 | ||
Med | oak tree | Fall 2013 | |
High | Fall 2013 | ||
Med | Fall 2013 | ||
Summer 2013 | |||
High | Summer 2013 | ||
High | Summer 2013 | ||
Summer 2013 | |||
Med | Summer 2013 | ||
Summer 2013 | |||
Spring 2014 | |||
High | Summer 2013 |
– b