| Project |
Status |
Updated |
| Replace Furnace
|
Complete |
3/3/2006 |
| Clean out Garage/Yard
|
Complete |
3/12/2006 |
| Master Bedroom
Closet |
Complete |
7/3/2006 |
| Relocate main
bathroom light switch |
Complete |
6/24/2006 |
| Molding, Trim new doors
|
In Process |
1/18/2009 |
| Replace receptacles
and switches main floor |
In Process |
6/11/2006 |
| Rewire receptacles and
switches in gear room "Receptacle of Death" |
Completed |
1/1/2007 |
| Install home network
|
Completed |
11/24/2007 |
| Setup home entertainment center |
|
|
| Install/configure hot water
pump |
Complete |
3/2/2006 |
| Install pellet stove
|
Complete |
8/23/2007 |
| Install new kitchen
windows |
Complete |
9/5/2006 |
| Repair garage wall
|
Complete |
5/23/2006 |
| Install new garage doors and
openers |
|
|
| Retaining wall |
|
|
| Install garage exterior door |
|
|
| Flip front door |
|
|
| New stairs |
|
|
| Window treatments |
|
|
| Fix-up pool shed
|
In Process |
8/2/2006 |
| Move Spring City garage
|
Complete |
3/19/2006 |
| Paint |
In Process |
5/28/2007 |
| Insulate attic
|
Complete |
11/2009 |
| Insulate above drop ceiling
downstairs |
|
|
| Remove old electric baseboard
wiring |
In Process |
|
| Insulate/finish open space between garage attic and downstairs
|
Complete |
10/28/2006 |
| Repair (rebuild?) deck
|
Complete |
10/2009 |
| Repair dryer vent |
Complete |
5/6/2006 |
| Repair pool receptacles |
|
|
| Install pool lighting |
|
|
| Install bigger pool gate |
|
|
| Rewire Dishwasher |
|
|
| Main bathroom 3 gang
receptacle |
|
|
| Kitchen cabinet and drawer
pulls |
Complete |
8/3/2006 |
| Install Proper Furnace
Return |
|
|
| Extend furnace exhaust
from under deck |
Complete |
11/24/2006 |
| Whole House Stereo
|
In Process |
10/2009 |
| Reroute Outside
spigots |
Complete |
4/16/2008 |
| Remove detached garage
center wall |
In Process |
10/25/2008 |
| Cat Door |
Complete |
3/14/2006 |
| Kitchen Pantry |
Complete |
3/17/2006 |
| Pool Skimmer |
Complete |
10/2009 |
| Open Pool
06 |
Complete |
5/6/2006 |
| Pool Filter |
Complete |
6/27/2006 |
| Kitchen Light |
Complete |
6/11/2006 |
| Garage Floor Cracks
|
Complete |
8/1/2006 |
| Replace Pool Pump |
Complete |
7/20/2006 |
| Cat Box |
Complete |
7/29/2007 |
| Bird Feeder |
Complete |
12/9/2006 |
| Overhang Insulation
|
Complete |
12/18/2006 |
| Reduct Ductwork |
In Process |
6/15/2008 |
| Whole House Fan |
|
|
| Bedroom Wall
Insulation |
Complete |
12/2/2007 |
| Caulk Siding |
In Process |
10/2009 |
| Fix and add recessed lights in Kitchen
|
Complete |
12/23/2007 |
| Add three-way switch to kitchen lights
|
Complete |
12/22/2007 |
| Built-in Coat Cubby |
|
|
| Interior Window |
|
|
| Whole House De-Humidifier |
In Process |
12/28/2007 |
| Service Water Conditioners |
Complete |
4/16/2008 |
| Pellet Shed |
|
|
| Gutter Drain |
Complete |
4/19/2008 |
| Upstairs Windows |
Complete |
1/18/2009 |
| Boat Rack |
In Process |
6/14/2008 |
| Garage Attic Opening |
In Process |
6/21/2008 |
| Gable Fan |
Complete |
5/8/2009 |
| Remodel Master Bath
Shower |
In Process |
11/2009 |
| |
|
|
| |
|
|