Project |
Status |
Updated |
Replace Furnace
|
Complete |
3/3/2006 |
Clean out Garage/Yard
|
Complete |
3/12/2006 |
Master Bedroom
Closet |
Complete |
7/3/2006 |
Relocate main
bathroom light switch |
Complete |
6/24/2006 |
Molding, Trim new doors
|
In Process |
1/18/2009 |
Replace receptacles
and switches main floor |
In Process |
6/11/2006 |
Rewire receptacles and
switches in gear room "Receptacle of Death" |
Completed |
1/1/2007 |
Install home network
|
Completed |
11/24/2007 |
Setup home entertainment center |
|
|
Install/configure hot water
pump |
Complete |
3/2/2006 |
Install pellet stove
|
Complete |
8/23/2007 |
Install new kitchen
windows |
Complete |
9/5/2006 |
Repair garage wall
|
Complete |
5/23/2006 |
Install new garage doors and
openers |
|
|
Retaining wall |
|
|
Install garage exterior door |
|
|
Flip front door |
|
|
New stairs |
|
|
Window treatments |
|
|
Fix-up pool shed
|
In Process |
8/2/2006 |
Move Spring City garage
|
Complete |
3/19/2006 |
Paint |
In Process |
5/28/2007 |
Insulate attic
|
Complete |
11/2009 |
Insulate above drop ceiling
downstairs |
|
|
Remove old electric baseboard
wiring |
In Process |
|
Insulate/finish open space between garage attic and downstairs
|
Complete |
10/28/2006 |
Repair (rebuild?) deck
|
Complete |
10/2009 |
Repair dryer vent |
Complete |
5/6/2006 |
Repair pool receptacles |
|
|
Install pool lighting |
|
|
Install bigger pool gate |
|
|
Rewire Dishwasher |
|
|
Main bathroom 3 gang
receptacle |
|
|
Kitchen cabinet and drawer
pulls |
Complete |
8/3/2006 |
Install Proper Furnace
Return |
|
|
Extend furnace exhaust
from under deck |
Complete |
11/24/2006 |
Whole House Stereo
|
In Process |
10/2009 |
Reroute Outside
spigots |
Complete |
4/16/2008 |
Remove detached garage
center wall |
In Process |
10/25/2008 |
Cat Door |
Complete |
3/14/2006 |
Kitchen Pantry |
Complete |
3/17/2006 |
Pool Skimmer |
Complete |
10/2009 |
Open Pool
06 |
Complete |
5/6/2006 |
Pool Filter |
Complete |
6/27/2006 |
Kitchen Light |
Complete |
6/11/2006 |
Garage Floor Cracks
|
Complete |
8/1/2006 |
Replace Pool Pump |
Complete |
7/20/2006 |
Cat Box |
Complete |
7/29/2007 |
Bird Feeder |
Complete |
12/9/2006 |
Overhang Insulation
|
Complete |
12/18/2006 |
Reduct Ductwork |
In Process |
6/15/2008 |
Whole House Fan |
|
|
Bedroom Wall
Insulation |
Complete |
12/2/2007 |
Caulk Siding |
In Process |
10/2009 |
Fix and add recessed lights in Kitchen
|
Complete |
12/23/2007 |
Add three-way switch to kitchen lights
|
Complete |
12/22/2007 |
Built-in Coat Cubby |
|
|
Interior Window |
|
|
Whole House De-Humidifier |
In Process |
12/28/2007 |
Service Water Conditioners |
Complete |
4/16/2008 |
Pellet Shed |
|
|
Gutter Drain |
Complete |
4/19/2008 |
Upstairs Windows |
Complete |
1/18/2009 |
Boat Rack |
In Process |
6/14/2008 |
Garage Attic Opening |
In Process |
6/21/2008 |
Gable Fan |
Complete |
5/8/2009 |
Remodel Master Bath
Shower |
In Process |
11/2009 |
|
|
|
|
|
|