Blog

Pool Work Cont.

I got all the low and uneven spots leveled with scabs instead of shims.

Now it’s time to lay down the decking and be done with it finally.

Jen decided to wait until the water level was lowered before continuing with the tiles. In the meantime she applied herself to the annual poison ivy removal project.

Yeah. The timing is a little off, but better late than never.

– b
 

 

Write a Comment

XHTML: You can use these tags: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>